Lead box gully & valleys at Jeremy Lane, Heckmondwike

This refurbishment involved replacement of a central box gully which had split due to installation in one piece.  The replacement was fitted in code 6 lead with a neoprene expansion joint welded centrally to cope with movement.  The four valleys were also replaced in code 5 lead sections because previous valleys were split due to incorrect fitting.