Lead box gullys & bay at Bath St, Dewsbury

This refurbishment involved replacement of parapet gullys and a bay roof which were all split.  With no steps in the majority of the timber gully construction, neoprene expansion joints had to be welded to the code 6 lead sections.  The lead bay was also covered in code 6 lead with a timber roll installed to provide central expansion joining.